Mission-critical liquid cooling for AI infrastructure.
We engineer, maintain, and repair the hydronic loops powering the next generation of dense compute. When flows drop or temperatures rise, we are on-site in under four hours — anywhere in our service map.

Why DataCenter.plumbing
Air-cooled habits don't survive a 130kW rack.
GPU thermal loads have outpaced traditional mechanical contractors. We're a focused crew of hydronic engineers and field technicians who live inside CDUs, manifolds, and quick-disconnect fittings — and we speak the language of data center operations.
Uptime-first response
2 to 4 hour SLA for leak containment, pump trips, CDU failover, and ΔT/ΔP excursions. We carry spare manifolds, QDs, and pumps in every truck.
AI-density expertise
Direct-to-chip and rear-door heat exchangers for H100, GB200, and MI300X clusters. Glycol management, water treatment, and dielectric fluid handling.
Designed to scale
Loop architecture sized for AI factory expansion: secondary loop sizing, manifold routing, expansion tanks, redundancy and heat-reuse interfaces.
Capabilities
Specialized hydronic services
24/7 Emergency Response
Guaranteed on-site arrival for leak mitigation, pump failure, and manifold pressure drops in high-density environments.
Design & Consulting
Secondary loop sizing, CDU placement, manifold routing, and retrofits for NVIDIA Blackwell and H100 clusters.
Hydronic Academy
Certification for data center technicians on hydronic safety, glycol management, and leak detection protocols.

Fittings · QDs · Manifolds
Every joint is a single point of failure. We treat it that way.
Blind-mate couplings, dripless quick-disconnects, and brass manifold assemblies installed and pressure-tested with documented torque, fluid chemistry, and leak-down records. Every connection traceable.
0
Class-1 leaks
14k+
Fittings live
100%
Documented

By the numbers
Scoped to hyperscale. Operated to a craftsman's standard.
4.2MW
Cooled capacity
99.99%
Thermal uptime
180m
Avg. response time
14k
Manifold fittings
Need immediate hydronic support?
Critical leak response, pump diagnostics, and pressure stabilization. Engineers en route in under 4 hours.